What areas does Level Ground Construction serve?
We're based in Seminole, Texas, and we work across Gaines County and the Permian Basin: Seminole, Seagraves, Loop, Denver City, Andrews, Brownfield, Lamesa, Midland, and Odessa. We also do dirt work, pads, and driveways in Hobbs and Lovington, New Mexico. If your town isn't on that list, call and ask — for bigger jobs we travel further.
What kinds of septic systems do you install?
Both families the state recognizes. A conventional system settles solids in a tank and returns the liquid to the soil through a drainfield. An aerobic system adds a blower, treats the water further, and disperses it above ground, usually by sprinklers — which is what you use when the soil won't take water, when caliche is close to the surface, or when the lot is too small for a full field. Which one you get is decided by the soil test, not by preference. Frank Redekopp holds Texas OSSF Installer I, Installer II, Site Evaluator, and Maintenance Provider licenses, so the evaluation, the install, and the servicing afterward all come from the same company.
Who pulls the septic permit?
In Texas a septic system has to be permitted before it goes in and inspected before it's used. The permit comes either from a local authorized agent — a county or city that TCEQ has delegated the job to — or from TCEQ's own regional office, depending on where your property sits. Who submits the application goes both ways in practice, so we settle that with you before work starts rather than leaving it as an assumption. The review itself is the part of the schedule nobody on our side of the table controls, which is why the first call ought to happen earlier than most people make it.
What is a caliche pad, and when do I need one?
Caliche is the hard, chalky rock layer under most of West Texas, and a caliche pad is a compacted surface built out of it. You need one anywhere heavy equipment or loaded trucks have to sit on dirt and keep sitting on it — well sites, work yards, equipment storage, shop aprons, and rural driveways. How long it lasts comes from the subgrade underneath and the compaction in each lift, not from how much material got dumped on top.
What's the difference between a caliche pad and a building pad?
A caliche pad is a working surface — built to be driven on, parked on, and worked off of. A building pad is a foundation platform, built to a tighter grade and compacted to carry a structure that won't tolerate settling. Same equipment, different tolerances, and it matters which one you ask for.
Do you work in New Mexico?
Yes — dirt work, pads, and driveways in Hobbs and Lovington. Septic is separate. New Mexico permits on-site wastewater through the New Mexico Environment Department under its own rules, not through TCEQ, so don't assume our Texas licensing carries across the line. Call and ask before you plan around it.
What should I have ready when I call?
The town and roughly where the property sits, what you're building or what's failed, and when you need it. For a septic system, add whether there's already a system on the ground and how many bedrooms the house has — or the headcount and the hours, if it's a commercial site. That's usually enough for Frank to tell you whether it's our kind of job and what has to happen first.